Context
Requirements
No disruption to live tenants
A dedicated liquid-cooled zone
Clear demarcation of responsibilities
Capacity for further zones later
Engineering challenge
Installing new overhead pipework and distribution above live equipment, within the existing plant capacity.
Proposed system
Integration approach
Works were sequenced around tenant windows, with temporary protection, method statements and staged pressure testing.
Outcome
Illustrative values
Illustrative
zone
converted in the first phase
Illustrative
planned tenant outages
Illustrative
zones
allowed for in future

Fig. 01 — On site

Fig. 02 — System detail