Stage 01 / 04
Establish operational requirements, computing density, thermal loads and facility constraints.
Site and load review
Operating strategy
Constraints and risks
Stage 02 / 04
Develop an appropriate cooling architecture and define the system requirements.
Architecture options
System requirements
Interface schedule
Stage 03 / 04
Coordinate system components and integration requirements within the project scope.
Interface coordination
Installation planning
Testing sequence
Stage 04 / 04
Provide the relevant documentation, technical coordination and ongoing support where offered.
Documentation
Commissioning support
Technical coordination
Principles
P—01
Requirements first
The system follows the load, the site and the operating model — not a preferred product.
P—02
Interfaces defined early
Every boundary between systems has an owner and a test.
P—03
Designed to be maintained
Access, isolation and documentation are part of the design.
P—04
Honest scope
We say what is in scope, what is not, and what depends on others.
To get started
Planned IT equipment and density
Site location and constraints
Programme and phasing
Existing drawings or standards
Operating and maintenance model