Before the coolant
Pipework is pressure tested and flushed to remove debris that could block fine cold plate channels.
Filling and treatment
The loop is filled, vented and treated according to the coolant specification.
Load testing
Load banks or staged IT loads confirm the system responds as designed across operating conditions.
Handover
Records, procedures and training give the operations team what they need to run the system safely.